Failed to fetch prices from EVEMarketer :(
1x Wyvern (-20% -10%)Item | Quantity | ME Waste | Volume | Price per Unit | Sum |
Materials | |||||
Capital Propulsion Engine | 45 | 0 | 90,000.00 m3 | 21,312,672.85 ISK | 959,070,278.25 ISK |
Capital Sensor Cluster | 9 | 0 | 18,000.00 m3 | 23,389,223.43 ISK | 210,503,010.87 ISK |
Capital Armor Plates | 23 | 0 | 46,000.00 m3 | 25,510,334.73 ISK | 586,737,698.79 ISK |
Capital Capacitor Battery | 68 | 0 | 136,000.00 m3 | 21,572,535.71 ISK | 1,466,932,428.28 ISK |
Capital Power Generator | 113 | 0 | 226,000.00 m3 | 22,436,904.39 ISK | 2,535,370,196.07 ISK |
Capital Shield Emitter | 113 | 0 | 226,000.00 m3 | 28,346,100.89 ISK | 3,203,109,400.57 ISK |
Capital Jump Drive | 90 | 0 | 180,000.00 m3 | 33,511,877.21 ISK | 3,016,068,948.90 ISK |
Capital Drone Bay | 225 | 0 | 450,000.00 m3 | 11,485,537.65 ISK | 2,584,245,971.25 ISK |
Capital Computer System | 36 | 0 | 72,000.00 m3 | 23,452,357.68 ISK | 844,284,876.48 ISK |
Capital Construction Parts | 45 | 0 | 90,000.00 m3 | 16,492,898.49 ISK | 742,180,432.05 ISK |
Capital Ship Maintenance Bay | 90 | 0 | 180,000.00 m3 | 29,950,636.84 ISK | 2,695,557,315.60 ISK |
Capital Corporate Hangar Bay | 45 | 0 | 90,000.00 m3 | 26,345,543.96 ISK | 1,185,549,478.20 ISK |
R-O Trigger Neurolink Conduit | 58 | 0 | 928.00 m3 | 26,551,712.08 ISK | 1,539,999,300.64 ISK |
Gravimetric-FTL Interlink Communicator | 113 | 0 | 11,300.00 m3 | 152,914,767.44 ISK | 17,279,368,720.72 ISK |
Auto-Integrity Preservation Seal | 720 | 0 | 11,520.00 m3 | 83,080.18 ISK | 59,817,729.60 ISK |
Life Support Backup Unit | 360 | 0 | 16,200.00 m3 | 121,475.28 ISK | 43,731,100.80 ISK |
Capital Core Temperature Regulator | 9 | 0 | 252,000.00 m3 | 687,867,299.27 ISK | 6,190,805,693.43 ISK |
Enhanced Neurolink Protection Cell | 1 | 0 | 55,000.00 m3 | 18,857,777,777.78 ISK | 18,857,777,777.78 ISK |
Total Volume | 2,150,948.00m3 | Production Costs | 64,001,110,358.28 ISK | ||
Waste | 0.00 ISK | ||||
Activity | Facility Fee | Team Cost | Station Tax | Total Cost | |
Manufacturing | 1,745,332,033.77 ISK | 0.00 ISK | 174,533,203.38 ISK | 1,919,865,237.15 ISK | |
Total Installation Cost | 1,919,865,237.15 ISK | ||||
Profit | |||||
Wyvern | 1 | 53,000,000.00 m3 | 0.00 ISK | 0.00 ISK | |
Repackaged | 1,300,000.00 m3 |